Factory ZERO
Detroit-Hamtramck Assembly

Factory ZERO is GM's first fully dedicated all-EV facility with contiguous battery assembly.

Location

2500 East Grand Blvd
Detroit, MI 48211
Map

Facility

Year Opened: 1985
Size: 4.51 million square feet / 365 acres
Union: UAW Local 22
Social: @MFG_GMFacebook

What We Do

Factory ZERO is the launchpad for General Motors’ multi-brand all-EV strategy. The facility builds a number of Ultium-based vehicles:

GMCHummer EV Pickup and SUV
ChevroletSilverado EV WT

Factory ZERO will also build the upcoming GMC Sierra Denali1 and the Cadillac Escalade IQ2, in addition to assembling Ultium battery cells into modules and packs for a variety of vehicle designs. 

 

1Available in 2024.
2Available in late 2024.

Visiting our campus? Please view our guide for protocols, dress code and other information before visiting. 

US Operations Impact Numbers

Photos & Videos

  • White 2022 GMC HUMMER EV with top removed parked on rocky beach with white cap waves crashing in background
  • The first US 2022 GMC HUMMER EV Pickup Edition 1 exits Factory ZERO in Detroit and Hamtramck, Michigan
  • Assembly line worker works on Hummer EV interior
  • Line of Hummer EVs make their way down assembly line next to American Flag
  • Three Hummer EV tailgates waiting to be installed
  • Assembly line worker works underneath  partially assembled Hummer EV
  • Crowd cheers as first completed Hummer EV rolls off assembly line
  • Near fully completed Hummer EV sits on assembled line
  • Join Our Team

    We’re looking for adventure seekers and imaginative thought leaders to help us transform mobility and advance an all-electric future.